From our friends in the air and on the ground and Build Oma:
“TERMINAL SPLIT
Starting Monday, February 17, the entire central portion of the Terminal, including Level 2, will close for construction.
Until the new Central Pavilion opens in 2027, Eppley Airfield will operate with two, separated terminals – the North Terminal and the South Terminal.
Each airline’s services, including ticketing, gates, and baggage claim are located within its Terminal.
To navigate between the terminals, travelers will need to exit the building and use the Terminal Drive crosswalks and center median and Level 1 of the South Garage.”
Learn more at:
https://www.buildoma.com/updates/oma-terminal-split-guide/